Permit Submittal Instructions
Residential, Mixed Use & Commercial Permit Submittal Instructions Below
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Your submittal should include in pdf format:
- Job plans
- Product information / specs
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 1-2 weeks for the review.
Please use application type Residential Electrical Other when applying for minor electrical work not covered by other electrical application types: Electric Panel, Battery Backup, EV Charger.
Generally, this application type will be used for minor electrical work including switches, outlets, and/or lighting.
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Your submittal should include the below information that is relevant to your project in pdf format:
- Reflective ceiling plan / line diagram
- Site plan for any exterior lighting. View or download a Sample Plot Plan HERE.
- Please specify if this if for all new electrical throughout.
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 1-2 weeks for the review.
RESIDENTIAL ELECTRICAL PANEL - NO SUBMITTAL REQUIRED.
Apply for your permit HERE .
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
View or download EV Charging Submittal requirements HERE.
Your submittal should include in pdf format:
- Job plans
- Product Information / specs
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 1-2 weeks for the review.
RESIDENTIAL FURNACE WITHOUT CONDENSER - NO SUBMITTAL REQUIRED.
Apply for your permit HERE .
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Before submitting, please view requirements for Electrical and Mechanical Outside Equipment Installations HERE.
Your submittal should include in pdf format:
- Simple site plan calling out the proposed location of the exterior equipment with respect to the property line and setbacks. View or download a Sample Plot Plan HERE.
- Product specs.
- Sound calculation confirming that it meets the requirements of the noise ordinance. Estimating sound levels with the inverse square law worksheet HERE.
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
The setback area for a residential property is measured by taking 1% of the lot size. For example: a 7,500 square foot lot has 7.5-foot interior yard setbacks. The minimum interior setback is 5 feet (for lots less than 5,000 square feet) and maximum interior setback is 15 feet (for lots greater than 15,000 square feet). All residential lots have a 15-foot exterior yard setback.
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 1-2 weeks for the review.
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
View Requirements for Residential Generator Installations HERE.
Your submittal should include in pdf format:
- Simple site plan calling out the proposed location of the exterior equipment with respect to the property line and setbacks. View or download a Sample Plot Plan HERE.
- Product specifications / Information
- Electrical single line diagram including wire size, indicate transfer switch OR
- Gas line schematic showing size and type of pipe, if not a dedicated installation, BTU requirements of generator, location of gas shut-off valve and sedimentary trap
- Sound calculation confirming that it meets the requirements of the noise ordinance. Estimating sound levels with the inverse square law worksheet HERE.
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
The setback area for a residential property is measured by taking 1% of the lot size. For example: a 7,500 square foot lot has 7.5-foot interior yard setbacks. The minimum interior setback is 5 feet (for lots less than 5,000 square feet) and maximum interior setback is 15 feet (for lots greater than 15,000 square feet). All residential lots have a 15-foot exterior front yard setback.
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 1-2 weeks for the review.
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Before submitting, please view requirements for Electrical and Mechanical Outside Equipment Installations HERE.
Your submittal should include in pdf format:
- Simple site plan calling out the proposed location of the exterior equipment with respect to the property line and setbacks. View or download a Sample Plot Plan HERE.
- Product specs.
- Sound calculation confirming that it meets the requirements of the noise ordinance. Estimating sound levels with the inverse square law worksheet HERE.
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
The setback area for a residential property is measured by taking 1% of the lot size. For example: a 7,500 square foot lot has 7.5-foot interior yard setbacks. The minimum interior setback is 5 feet (for lots less than 5,000 square feet) and maximum interior setback is 15 feet (for lots greater than 15,000 square feet). All residential lots have a 15-foot exterior yard setback.
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 1-2 weeks for the review.
Please use application type Residential Mechanical when applying for minor mechanical work not covered by other mechanical application types.
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Before submitting, please view requirements for Electrical and Mechanical Outside Equipment Installations HERE.
Your submittal should include in pdf format:
- Simple site plan calling out the proposed location of the exterior equipment with respect to the property line and setbacks. View or download a Sample Plot Plan HERE.
- Product specs.
- Sound calculation confirming that it meets the requirements of the noise ordinance. Estimating sound levels with the inverse square law worksheet HERE.
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
The setback area for a residential property is measured by taking 1% of the lot size. For example: a 7,500 square foot lot has 7.5-foot interior yard setbacks. The minimum interior setback is 5 feet (for lots less than 5,000 square feet) and maximum interior setback is 15 feet (for lots greater than 15,000 square feet). All residential lots have a 15-foot exterior yard setback.
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 1-2 weeks for the review.
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
View Requirements for Residential Kitchens and Bath Remodels HERE.
Additional handout resources: Sample Bath Plan HERE, Curbless Shower Guidelines HERE, Shower Enclosures HERE, Carbon Monoxide and Smoke Alarms HERE
Your submittal should include in pdf form:
- Plans must be in .pdf format and scaled for printing on a minimum paper size 11 x 17.
- Plans must be adequately dimensioned (minimum 1/4" scale). If clarity is compromised due to the number or complexity of details provided, paper size and/or scale should be increased.
- Title Block information must include owner’s name, architect (stamped and wet-signed) or name of designer who drew the plans, project address, applicable code editions, sheet index, scope of project, and any other information relevant to the project. All pages must be numbered.
- Provide plot plan in addition to relevant elevations when changes to the exterior are proposed. Provide plan view (floor plan) of affected area and adjoining rooms/areas (at minimum) showing both existing conditions and proposed changes as well as size and intended or proposed use(s). Note finished ceiling height(s) on floor plan for all affected rooms. The lowest allowable height for a kitchen or bathroom is 7' from finished floor. Clearly indicate any addition/replacement/modification to doors/windows, etc. on exterior and interior walls.
- Again, adequate dimensioning is a key component to plan clarity. Generally, the more clearly and thoroughly a project is dimensioned the easier it will be to understand.
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 2 weeks for the review.
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Before submitting, please view requirements for Plan Submittal Requirements HERE.
ONLY complete submittals will be processed. Generally, the submittal should include plans (architectural, structural, civil), structural calcs,T24 energy reports, product information, soils report and review letter, etc.
Your submittal should include all below relevant information in pdf format:
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 4 - 6 weeks for the review.
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
View Requirements for Residential Photovoltaic Systems HERE
Additional handout resources: Photovoltaic Checklist
Your submittal should include in pdf format:
- Job plans
- Product Information / specs
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 1-2 weeks for the review.
Please use application type Residential Plumbing Other when applying for minor plumbing work not covered by other plumbing application types: Water Heaters, Water Service, or Sewer Lateral.
Generally, this application type will be used for minor plumbing work like installation of fire pits, built-in BBQs, fireplace inserts, gas fireplace installation, outdoor heaters, wall heaters, outdoor showers, etc.
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Your submittal should include the below information that is relevant to your project in pdf format:
- Product Information / specs
- Please submit a gas line schematic including the length, point of origin to appliance being served, pipe material and diameter.
- Please provide a gas line calculation. View or download Sample Gas Pipe Calculation HERE.
- If installing roof mounted solar hot water we need framing details and roof span information and confirmation from an engineer.
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 1-2 weeks for the review.
RESIDENTIAL COMP SHINGLES RE ROOF - NO SUBMITTAL REQUIRED.
Apply for your permit HERE .
RESIDENTIAL OTHER RE ROOF - NO SUBMITTAL REQUIRED.
Apply for your permit HERE .
RESIDENTIAL SEWER LATERAL - NO SUBMITTAL REQUIRED.
Apply for your permit HERE .
RESIDENTIAL WATER SERVICE - NO SUBMITTAL REQUIRED.
Apply for your permit HERE .
RESIDENTIAL WATER HEATER - NO SUBMITTAL REQUIRED.
Apply for your permit HERE .
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Your submittal should include all below relevant information in pdf format:
- Please submit a gas line schematic including the length, point of origin to appliance being served, pipe material and diameter.
- Please provide a gas line calculation. View or download Sample Gas Pipe Calculation HERE.
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 1-2 weeks for the review.
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Before submitting, please view requirements for Electrical and Mechanical Outside Equipment Installations HERE.
Your submittal should include in pdf format:
- Simple site plan calling out the proposed location of the exterior equipment with respect to the property line and setbacks*. View or download a Sample Plot Plan HERE.
- Product specs.
- Sound calculation confirming that it meets the requirements of the noise ordinance. Estimating sound levels with the inverse square law worksheet HERE.
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
*Minimum Setbacks:
- Front - 15 feet from street property line - except for parking structures on slopes and certain 2nd units
- Sides and rear - 1 foot per 1,000 square feet of lot area, with minimum of 5 feet and maximum of 15 feet (for example: lot = 8,300 sq. ft. minimum setback = 8.3 feet)
- Setbacks apply to all structures over 18 inches above the natural grade (and also below grade pools and hot tubs), except fences
- Creek setback – no structures are permitted within 30 feet of the top of bank of the following creeks: Warner Canyon, Corte Madera, Sutton Manor, Old Mill, or Reed
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 1-2 weeks for the review.
RESIDENTIAL WINDOW AND DOORS (SAME LOCATION, SAME OPENINGS) - NO SUBMITTAL REQUIRED.
Apply for your permit HERE .
Please notes any changes to locations or openings should be applied for as a RESIDENTIAL PLAN CHECK. Elevation and framing details will be required.
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Before submitting, please view requirements for Plan Submittal Requirements HERE.
ONLY complete submittals will be processed.
Your submittal should include all below relevant information in pdf format:
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 4 - 6 weeks for the review.
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Your submittal should include in pdf format:
- Product specifications/information for any proposed equipment or appliance installation.
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 1-2 weeks for the review.
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Your submittal should include in pdf format:
- Product specifications/information for any proposed equipment or appliance installation.
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 1-2 weeks for the review.
Please apply for permit type Commercial Plan Check for all proposed commercial work that is not othewise covered by commercial permit types: Commercial Photovoltaic, Commercial Re-Roof. Commercial Electrical, Mechanical, or Plumbing (water heaters, furnaces, or electrical service panel installations)
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Before submitting, please view Plan Submittal Requirements HERE.
ONLY complete submittals will be processed.
All files for upload should follow the below naming convention in pdf format only:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 4 - 6 weeks for the review.
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Your submittal should include in pdf format:
- Product specifications/information for any proposed equipment or appliance installation.
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
When you are ready to submit your documents, log in to eTRAKiT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 1-2 weeks for the review.
Once your online application is complete, you will upload the required submittal documents through your account on eTRAKiT HERE.
Your submittal should include all below relevant information in pdf format:
- All files for upload should follow the below naming convention:
Street Name Street Number - Permit Number - Document Type.pdf
Example: Corte Madera 26 - B-000000 - Structural Calcs.pdf
When you are ready to submit your documents, log in to eTRAKIT HERE. Once logged in, go to your dashboard and click on the paper clip icon associated with your permit number to upload your COMPLETE submittal. Once your submittal has been uploaded it will be routed for review. Once the review is complete, you will be contacted regarding any outstanding comments or next steps for permitting.
Please allow 4 - 6 weeks for the review.
COMMERCIAL COMP SHINGLE RE ROOF - NO SUBMITTAL REQUIRED.
Apply for your permit HERE .
COMMERCIAL OTHER RE ROOF - NO SUBMITTAL REQUIRED.
Apply for your permit HERE .